- Thermal related Reports / Documents
- Project Appraisal
- Thermal Project Monitoring
- Renovation and Modernization of Thermal Power Stations
- Design and Engineering

- Thermal Engineering and Technology Development
- Report of the Committee to study design features of Chinese Boilers
- Standard Technical Specification For Main Plant Package of Sub-Critical Thermal Power Project 2 x (500 MW or Above)

- Review of land Requirement For Thermal Power Stations

- Standard Design Criteria/ Guidelines for Balance Of Plant of 2x(500 MW or above) Thermal Power Project

- Special Reports and Articles
- Balance of Plant order status

- Land Requirement of Thermal Power Stations

- Report of the committee to recommend next higher size of coal fired thermal power stations

- Data on petroleum fuels being used by various G.T. and diesel engine power plants in the country

- Report of the expert committee on fuels for power generation

- List of Thermal Projects cleared by CEA
- Report of site visits by site selection team

- Recommendation of committees on:
- Estimated, requirement & electrical equipments for T.P. projects scheduled for 11th plan

- Reduction in cost of civil works of tpp as suggested by the review committees of experts constituted in CEA

- Guidelines for preparing the civil cost estimates of transmission system project

- Write-up on ash utilization

- Strategies for ash utilization & progressive ash generation & utilization of coal/lignite based TPS

- List of stations with 100% ash utilization

- Progressive ash generation & utilization (Year-wise)

- Brief progress report for Sasan, Mundra and Krishnapatnam UMPPs.

- Review of tendering procedures and documents followed by public utilities for Renovation & Modernisation projects

- Balance of Plant order status
- Hydro related Reports / Documents
- Draft of conclave on model contract documents for development of hydro projects

- Hydro development plan for 12th five year plan

- Draft-model contract document of hydro power projects
- Status of hydroelectric potential development
- List of hydroelectric stations in the country

- Monthly generation from hydroelectric stations
Monthly generation of hydro-electric stations Year All India monthly actual
generations V/s targetAll India cummulative actual
generations V/s targetUtility & Month Wise
Hydro generation target2007-08 Figures Chart Figures Chart 2008-09 Figures Chart Figures Chart 2009-10 Figures Chart Figures Chart 2010-11 Figures Chart Figures Chart Figures 2011-12 Figures Chart Figures Chart Figures - Project Monitoring
- Hydroelectric projects commissioned in 10th plan

- Hydroelectric projects commissioned in 11th plan

- Hydroelectric projects under execution

- Status of hydroelectric projects under execution

- Tentative hydro capacity addition programme 2010-11

- Tentative hydro capacity addition programme 2011-12

- Reasons for hydro capacity slipping from 11th plan & with efforts in 11th plan

- Hydroelectric projects commissioned in 10th plan
- Status of Project Clearance
- Monitoring matrix for hydro electric schemes received

- Status of cost estimates for stage-I activities

- Status of according of commercial viability

- Status of cost estimates for stage-II activities

- Hydro electric projects cleared by CEA and yet to be taken up for implementation

- Hydro Electric Schemes allotted by States in Private Sector which are yet to be taken up for construction (Above 25 MW)

- Central/State sector hydro schemes (Electricity Act)

- Private sector hydro schemes (Electricity Act)

- Monitoring matrix for hydro electric schemes received
- Status of 50,000 MW hydro-electric initiative

- R&M of hydro-electric power stations

- Design and Engineering

- Cooperation with neighbouring countries
- Hydro Performance Review (Summary)
- Hydro-electric schemes under survey & investigation

- PFRs under 50,000 MW hydro initiative

- Special Reports
- Draft of conclave on model contract documents for development of hydro projects
- Planning related Reports / Documents
- All India Installed Capacity-State wise/Utility Wise
- CDM - CO2 Baseline Database
- Summary report of mapping of 85 pulverized coal fired thermal power generating units in different states (Under Indo-German energy program)

- Projects under construction for likely benefits during 12th plan

- Report on Carbon Tetra Chloride (CTC) phase out from power sector given by committee constituted by Chairperson, CEA

- Expected projects to be commissioned during 2009-10

- Expected projects to be commissioned during 2010-11

- Report regarding adequacy of unloading infrastructure at TPS

- Capacity addition target in 11th plan set by Planning Commission (revised)

- Projects commissioned / being monitored for benefits during 11th plan

- All India Electricity Statistics (General Review)
- General Review Formats
- Organizations pursuing R&D concerning power sector
- Power Scenario at a Glance

- Equipment and material for development of power sector

- Report of working group on power(11th plan)

- Key inputs for accelerated development of power sector

- White paper on strategy for 11th plan

- National Electricity Plan

- Data format for performance award & effciency
- Guidelines for qualifying requirements for bidders of Balance of Plant

- Power System related Reports / Documents
- Meetings Notice of SP&PA
- Northern Region
- Notices and minutes of meetings of SP&PA for northern region
- Meeting on Transmission System associated with Parbati & Koldam HEP on 26-11-2008

- Minutes of Meeting on Transmission System associated with Parbati & Koldam HEP

- Western Region
- Northern Region
- Standing Committee on Power System Planning
- Region Wise Power Map of India
- Eastern Region
- POWER MAP FOR EASTERN REGION
- Eastern Region I

- Eastern Region II with IPP

- Bihar

- DVC

- Jharkhand

- Orissa

- Sikkim

- West Bengal

- Eastern Region
- Power System Project Monitoring
- The project schemes pertaining to transmission and transformation works at 220 kV and above are monitored by the Power System Project Monitoring (PSPM) Division of the Central Electricity Authority. Transmission works of 132 kV are also monitored in certain cases as also for the States of North-Eastern Region.
- All the transmission schemes of the Power Utilities have been divided in the two categories:
- The schemes which are connected basically with evacuation of Power from generating stations and
- The schemes that are connected with the strengthening of power system network. Utility-wise progress of transmission works for evacuation of power from stations are furnished in "D".
- Transmission Capacity Addition during 9th Plan (1997-2002) and Programme of Construction
Monthly Progress Report of Construction of Transmission Works
- Executive Summary Of Transmission Works

- Statement Showing Transmission Lines Completed During the Year Till Date

- Statement Showing The Sub Station Completed During The Year Till Date

- Report Indicating Status of Construction of Transmission Lines (220 KV & Above) Vis-a-Vis Programme during 2011-12

- Report Indicating Status of Construction of Sub-stations (220 KV & Above) Vis-a-Vis Programme during 2011-12

- Status Of Transmission Schemes For Evacuation Of Power From Generating Stations Scheduled For the year 10-11 and Year 11-12

- Transmission Capacity Addition Programme During 2005-06

- Transmission Capacity Addition Programme During 2006-07

- Transmission Capacity Addition Programme During 2007-08

- Transmission Capacity Addition Programme During 2008-09

- Transmission Capacity Addition Programme During 2009-10

- Transmission Capacity Addition During X Plan and Programme of Construction For XI Plan

- Executive Summary Of Transmission Works
- R&M of Power Systems

- Design & Engg. by CEA
- Draft National Electricity Plan - Transmission
Draft National Electricity Plan - Transmission Towards fulfillment of the requirement as mandated in Section 3 (4) of Electricity Act 2003, the draft National Electricity Plan covering Transmission aspects has been prepared.
Draft National Electricity Plan – Transmission (July 2005)
CoverPage 
Chapter-1 Introduction 
Chapter-2 Policy, Growth Objectives and Development Process in Transmission 
Chapter-3 Transmission Planning Philosophy 
Chapter-4 Projected Requirement of Inter-Regional Transmission of Power 
Chapter-5 X Plan Programme 
Annex_5.1and5.2_List_of_765_HVDC_XPlan 
Annex_5.3_Trans_Completed_2002-03 
Annex_5.4_Trans_Completed_2003-04 
Annex_5.5_Trans_Completed_2004-05 
Annex_5.6_Trans_Program_2005-06 
Annex_5.7_Trans_Program_2006-07 
Annex_5.8_Trans_Prog_Gen_Add_41kMW 
Chapter-6 XI Plan Programme 
Exhibits 
All India Grid Map 2011_12 
All the stakeholders may forward their suggestions / objections / comments/ feedback on this Draft National Electricity Plan – Transmission, to the, Chief Engineer (SP&PA) at the address mentioned below, by October 31, 2005. The Chief Engineer,System Planning & Project Appraisal Division,Central Electricity Authority,Sewa Bhawan, R. K. Puram,New Delhi – 110 066. - Grid Map 2011-12 (400 KV and above)

- 765 KV System in India
- HVDC System in India
- Inter-region Transmission Capacity
- Hydro projects in Sikkim - Transmission Systems

- Hydro projects in HP - Transmission Systems
- Hydro projects in Uttarakhand - Transmission Systems

- Master Plan for HEPs in Arunachal Pradesh

- Special Reports
- Failure of Circuit Breaker at Ranasan and Transformer at Limdi substations of GETCO

- Failure of Transformers at Wazirabad, Mehrauli and Lodhi Road substations of DTL

- Failure of transformers of Gujarat Energy Transmission Corporation Ltd.

- Failure of 400/220kV/33kV 315MVA Transformer at Bamnauli

- Evacuation arrangement report on Uttaranchal Hydro Project

- Failure of Circuit Breaker at Ranasan and Transformer at Limdi substations of GETCO
- Electrical Inspectorate
- Format of Work Completion Certificate-To be submitted by the owner along with the application for statutory inspection of the Electrical Installations under Regulations 43/36 of CEA(Measures Relating to Safety and Electric Supply)Regulations,2010

- Details of Deptt./Organisations of Central Government and UTs under the control of Chief Electrical Inspector to the Govt. of India

- FORM A - Application for the Statutory Inspection of the Electrical Installations under Regulations 43 & 32 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- FORM B - Application for the Statutory Inspection of the Overhead Transmission Lines under Regulations 43 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- FORM C - Application for Statutory Periodical Inspection of the Electrical Installations under Regulations 30 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- Instructions for filling the Application Form under Regulations 30, 32 & 43 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- Addresses of Jurisdiction of RIOs

- Notification of Intimation of Accidents Rules, 2004 and as amended upto date

- Format of Work Completion Certificate-To be submitted by the owner along with the application for statutory inspection of the Electrical Installations under Regulations 43/36 of CEA(Measures Relating to Safety and Electric Supply)Regulations,2010
- Meetings Notice of SP&PA
- Grid Operation and Distribution related Reports/ Documents
- Operation Performance Monitoring
- Grid Management
- Distribution Planning and Development
- Power And Telecommunication Coordination Committee

- Status of PTCC Cases
- Special Reports
- Guidelines for Project Management & Performance Evaluation of Sub-transmission and Distribution Projects
- Introduction

- Guide lines for implementation activities of ST&DP

- Guidelines for monitoring & performance evaluation(pime) of ST&DP

- Methodology for performance evaluation of ST&DP

- Guidelines for O&M of sub-transmission and distribution equipment

- Guidelines for R&M and RLA studies of sub transmission and distribution equipment

- Conclusion

- Legend :
- ST&DP : sub transmission and distribution project
- O&M : operation and maintenance
- R&M : renovation and modernisation
- RLA : residual life assesment
- Introduction
- Guidelines for Formulation of Report on Strengthening and Improvement of Sub-transmission and Distribution Network under Accelerated Power Development & Reform Programme
- Guidelines for Framing Technical Specification of Shunt Capacitors Distribution Transformers AC Electrical Energy Meters ACSR Conductors 11 KV &: 33 KV XLPE Cables
- Pedestal mounted HT Capacitors

- Pole mounted 12 kV Capacitors

- LT Capacitors

- Outdoor type Distribution Transformers upto and including 100 kVA

- Outdoor type sealed Distribution Transformers upto and including 100 kVA.

- Outdoor type completely self protected Distribution Transformers upto and including 100 kVA

- Single phase outdoor type Distribution Transformers.

- Distribution Transformer above 100 kVA

- Protection schemes for Distribution Transformers.

- Electro Mechanical whole current Energy Meters

- Static whole current Energy Meters

- Static CT/CVT operated Trivector Meters

- ACSR conductors

- 11 and 33 kV XLPE Cable

- Pedestal mounted HT Capacitors
- Guidelines for Project Management & Performance Evaluation of Sub-transmission and Distribution Projects
- Regional Power Committees
- Economic and Commercial related Reports/ Documents
- Regulations under the Electricity Act, 2003
- Tariff for sale of power from atomic power stations of NPCIL

- Projects Awarded Through Tariff based Competitive Bidding Route

- Estimated average rates of electricity

- Expenditure in power sector

- Status of implementation of National Electricity Policy 2005

- Sample RFP for urban distribution franchisee

- Plan-wise outlay / expenditure for power sector

- Outstanding dues payable to central public sector undertakings

- State-wise status of implementation of provisions of National Tariff Policy (NTP) 2006




