- Thermal related Reports / Documents
- Project Appraisal
- Thermal Project Monitoring
- Renovation and Modernization of Thermal Power Stations
- Design and Engineering

- Thermal Engineering and Technology Development
- Report on minimisation of water requirement in coal based thermal power stations

- Report of the Group for Studying Range of Blending of Imported Coal with Domestic Coal

- Report of the Committee to study design features of Chinese Boilers
- Standard Technical Specification For Main Plant Package of Sub-Critical Thermal Power Project 2 x (500 MW or Above)

- Review of land Requirement For Thermal Power Stations

- Standard Design Criteria/ Guidelines for Balance Of Plant of 2x(500 MW or above) Thermal Power Project

- Report on minimisation of water requirement in coal based thermal power stations
- Special Reports and Articles
- Balance of Plant order status

- Land Requirement of Thermal Power Stations

- Report of the committee to recommend next higher size of coal fired thermal power stations

- Data on petroleum fuels being used by various G.T. and diesel engine power plants in the country

- Report of the expert committee on fuels for power generation

- List of Thermal Projects cleared by CEA
- Report of site visits by site selection team

- Recommendation of committees on:
- Estimated, requirement & electrical equipments for T.P. projects scheduled for 11th plan

- Reduction in cost of civil works of tpp as suggested by the review committees of experts constituted in CEA

- Guidelines for preparing the civil cost estimates of transmission system project

- Write-up on ash utilization

- Strategies for ash utilization & progressive ash generation & utilization of coal/lignite based TPS

- List of stations with 100% ash utilization

- Progressive ash generation & utilization (Year-wise)

- Brief progress report for Sasan, Mundra and Krishnapatnam UMPPs.

- Review of tendering procedures and documents followed by public utilities for Renovation & Modernisation projects

- Report on Fly Ash Generation at Coal/Lignite based Thermal Power Stations and its utilization in the Country for the year 2010-11

- General Guidelines for 765/400/220/132 KV Sub-Station & Switchyard of Thermal/Hydro Power Projects

- Balance of Plant order status
- Hydro related Reports / Documents
- Draft of conclave on model contract documents for development of hydro projects

- Hydro development plan for 12th five year plan

- Draft-model contract document of hydro power projects
- Status of hydroelectric potential development
- List of hydroelectric stations in the country

- Monthly generation from hydroelectric stations
Monthly generation of hydro-electric stations Year All India monthly actual
generations V/s targetAll India cummulative actual
generations V/s targetUtility & Month Wise
Hydro generation target2007-08 Figures Chart Figures Chart 2008-09 Figures Chart Figures Chart 2009-10 Figures Chart Figures Chart 2010-11 Figures Chart Figures Chart Figures 2011-12 Figures Chart Figures Chart Figures 2012-13 Figures Chart Figures Chart Figures 2013-14 Figures Chart Figures Chart Figures - Project Monitoring
- Status of Project Clearance
- Monitoring matrix for hydro electric schemes received

- Status of cost estimates for stage-I activities

- Status of according of commercial viability

- Status of cost estimates for stage-II activities

- Hydro electric projects cleared by CEA and yet to be taken up for implementation

- Hydro Electric Schemes allotted by States in Private Sector under survey & investigation (Above 25 MW)

- Central/State sector hydro schemes (Electricity Act)

- Private sector hydro schemes (Electricity Act)

- Monitoring matrix for hydro electric schemes received
- Status of 50,000 MW hydro-electric initiative

- R&M of hydro-electric power stations

- Design and Engineering

- Cooperation with neighbouring countries
- Hydro Performance Review (Summary)
- Hydro-electric schemes under survey & investigation

- PFRs under 50,000 MW hydro initiative

- Special Reports
- Draft of conclave on model contract documents for development of hydro projects
- Planning related Reports / Documents
- All India Installed Capacity-State wise/Utility Wise
- CDM - CO2 Baseline Database
- Summary report of mapping of 85 pulverized coal fired thermal power generating units in different states (Under Indo-German energy program)

- Report on Carbon Tetra Chloride (CTC) phase out from power sector given by committee constituted by Chairperson, CEA

- Plan Wise Capacity Addition (from 7th Plan onwards)

- Capacity addition target in 11th plan set by Planning Commission

- Capacity addition for 11th Plan as per MTA of Planning Commission

- Capacity addition achieved during the 11th Plan

- Capacity addition target during 2012-13

- Capacity addition achieved during the 2012-2013

- Power Scenario at a Glance

- Report of working group on power(12th plan)

- Draft National Electricity Plan for 12th Plan
- Report regarding adequacy of unloading infrastructure at TPS

- All India Electricity Statistics (General Review)
- General Review Formats
- Organizations pursuing R&D concerning power sector
- Equipment and material for development of power sector

- Key inputs for accelerated development of power sector

- White paper on strategy for 11th plan

- Data format for performance award & effciency
- Guidelines for qualifying requirements for bidders of Balance of Plant

- Power System related Reports / Documents
- Transmission Planning Criteria
- Manual on Transmission Planning Criteria - Jan 2013 (New)
- Review of Old Manual(1994)- (i)Public Notice (ii)Discussion Note (iii)Part-I (iv)Part-II
- Meetings Notice of SP&PA
- Northern Region
- Notices and minutes of meetings of SP&PA for northern region
- Meeting on Transmission System associated with Parbati & Koldam HEP on 26-11-2008

- Minutes of Meeting on Transmission System associated with Parbati & Koldam HEP

- Western Region
- Northern Region
- Standing Committee on Power System Planning
- Power System Project Monitoring
- The project schemes pertaining to transmission and transformation works at 220 kV and above are monitored by the Power System Project Monitoring (PSPM) Division of the Central Electricity Authority. Transmission works of 132 kV are also monitored in certain cases as also for the States of North-Eastern Region.
- All the transmission schemes of the Power Utilities have been divided in the two categories:
- The schemes which are connected basically with evacuation of Power from generating stations and
- The schemes that are connected with the strengthening of power system network. Utility-wise progress of transmission works for evacuation of power from stations are furnished in "D".
- Progress Report of Transmission Works
- Transmission Capacity Addition during 9th Plan (1997-2002) and Programme of Construction
- Transmission Capacity Addition Programme During 2005-06

- Transmission Capacity Addition Programme During 2006-07

- Transmission Capacity Addition Programme During 2007-08

- Transmission Capacity Addition Programme During 2008-09

- Transmission Capacity Addition Programme During 2009-10

- Transmission Capacity Addition During X Plan and Programme of Construction For XI Plan

- Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 25th June 2012

- Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 23rd July 2012 .

- Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 30th October 2012 .

- Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 23rd November 2012 .

- R&M of Power Systems

- Design & Engg. by CEA
- Draft National Electricity Plan for 12thPlan
- Grid Map 2011-12 (400 KV and above)

- 765 KV System in India
- HVDC System in India
- Inter-region Transmission Capacity
- Hydro projects in Sikkim - Transmission Systems

- Hydro projects in HP - Transmission Systems
- Hydro projects in Uttarakhand - Transmission Systems

- Master Plan for HEPs in Arunachal Pradesh

- Special Reports
- Failure of Circuit Breaker at Ranasan and Transformer at Limdi substations of GETCO

- Failure of Transformers at Wazirabad, Mehrauli and Lodhi Road substations of DTL

- Failure of transformers of Gujarat Energy Transmission Corporation Ltd.

- Failure of 400/220kV/33kV 315MVA Transformer at Bamnauli

- Evacuation arrangement report on Uttaranchal Hydro Project

- Failure of Circuit Breaker at Ranasan and Transformer at Limdi substations of GETCO
- Electrical Inspectorate
- Format of Work Completion Certificate-To be submitted by the owner along with the application for statutory inspection of the Electrical Installations under Regulations 43/36 of CEA(Measures Relating to Safety and Electric Supply)Regulations,2010

- Details of Deptt./Organisations of Central Government and UTs under the control of Chief Electrical Inspector to the Govt. of India

- FORM A - Application for the Statutory Inspection of the Electrical Installations under Regulations 43 & 32 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- FORM B - Application for the Statutory Inspection of the Overhead Transmission Lines under Regulations 43 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- FORM C - Application for Statutory Periodical Inspection of the Electrical Installations under Regulations 30 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- Instructions for filling the Application Form under Regulations 30, 32 & 43 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

- Addresses of Jurisdiction of RIOs

- Notification of Intimation of Accidents Rules, 2004 and as amended upto date

- Format of Work Completion Certificate-To be submitted by the owner along with the application for statutory inspection of the Electrical Installations under Regulations 43/36 of CEA(Measures Relating to Safety and Electric Supply)Regulations,2010
- National Transmission Grid Master Plan (NTGMP) for Bhutan corresponding to 2020 & 2030
- General Guidelines for 765/400/220/132 KV Sub-Station & Switchyard of Thermal/Hydro Power Projects

- Transmission Planning Criteria
- Grid Operation and Distribution related Reports/ Documents
- Operation Performance Monitoring
- Grid Management
- Distribution Planning and Development
- Guidelines for specifications of Single & Three Phase Transformers

- Village Electrification

- Pumpset Energisation

- Reliability Indices - Annual
- Reliability Indices - Monthly

- Best Practices of Discoms
- Corrigendum and subssequently Revised Comprehensive Award Scheme(s) for the Distribution Companies and Rural Distribution Franchisees (RDFs) for the year 2011-12

- Guidelines for specifications of Single & Three Phase Transformers
- Power And Telecommunication Coordination Committee

- Status of PTCC Cases
- Special Reports
- Guidelines for Project Management & Performance Evaluation of Sub-transmission and Distribution Projects
- Introduction

- Guide lines for implementation activities of ST&DP

- Guidelines for monitoring & performance evaluation(pime) of ST&DP

- Methodology for performance evaluation of ST&DP

- Guidelines for O&M of sub-transmission and distribution equipment

- Guidelines for R&M and RLA studies of sub transmission and distribution equipment

- Conclusion

- Legend :
- ST&DP : sub transmission and distribution project
- O&M : operation and maintenance
- R&M : renovation and modernisation
- RLA : residual life assesment
- Introduction
- Guidelines for Formulation of Report on Strengthening and Improvement of Sub-transmission and Distribution Network under Accelerated Power Development & Reform Programme
- Guidelines for Framing Technical Specification of Shunt Capacitors Distribution Transformers AC Electrical Energy Meters ACSR Conductors 11 KV &: 33 KV XLPE Cables
- Pedestal mounted HT Capacitors

- Pole mounted 12 kV Capacitors

- LT Capacitors

- Outdoor type Distribution Transformers upto and including 100 kVA

- Outdoor type sealed Distribution Transformers upto and including 100 kVA.

- Outdoor type completely self protected Distribution Transformers upto and including 100 kVA

- Single phase outdoor type Distribution Transformers.

- Distribution Transformer above 100 kVA

- Protection schemes for Distribution Transformers.

- Electro Mechanical whole current Energy Meters

- Static whole current Energy Meters

- Static CT/CVT operated Trivector Meters

- ACSR conductors

- 11 and 33 kV XLPE Cable

- Pedestal mounted HT Capacitors
- Guidelines for Project Management & Performance Evaluation of Sub-transmission and Distribution Projects
- Regional Power Committees
- Economic and Commercial related Reports/ Documents
- Regulations under the Electricity Act, 2003
- Tariff for sale of power from atomic power stations of NPCIL
- Projects Awarded Through Tariff based Competitive Bidding Route

- Estimated average rates of electricity

- Expenditure in power sector

- Sample RFP for urban distribution franchisee

- Plan-wise outlay / expenditure for power sector

- Outstanding dues payable to central public sector undertakings

- State-wise status of implementation of provisions of Electricity Act 2003

- State-wise status of implementation of provisions of National Electricity Policy 2005

- State-wise status of implementation of provisions of National Tariff Policy 2006




