CONTENTS
Chapter Name
of the Chapter / Annexure
Chapter-1 Organization
Chapter-2 Planning for
Power Development
Chapter-3 Power Systems
Planning and Development
Chapter-4 Grid Operation
and Management
Chapter-5 Hydro Power
Development
Chapter-6 Thermal Power
Development
Chapter-7 Techno-Economic
Appraisal/Concurrence of Power Development Schemes
Chapter-8 Design &
Engineering Services
Chapter-9 Economic and
Commercial Aspects of Power Industry
Chapter-10 Training and
Human Resource Development
Chapter-11 Power Generation
& Rural Electrification
Chapter-12 Power Development
in North-Eastern Region
ANNEXURES
Annexure 2A List of Hydro
Project for which Power Absorption Studies were carried out during 2004-05
Annexure 3A Inter-Regional
Transmission capacity - Existing
Annexure 3B Inter-Regional
Transmission capacity – Programme 2005-07
Annexure 3C Inter-Regional
Transmission capacity – 11th
Plan Programme
Annexure 3D Statement showing
the Transmission Lines completed during the year 2004-05
Annexure 3E Statement showing
the Sub-Stations completed during the year 2004-05
Annexure 3F Issues pertaining
to Transmission System Planning – Resolved during the Year 2004-05
Annexure 4A Actual Power
Supply Position during 2004-05
Annexure 4B Status of Capacitor Installation
as on 31.03.2005
Annexure 5A PFRs under 50,000
MW Hydroelectric Initiative – State-wise list of schemes
Annexure 5B Hydro capacity
addition during 2004- 05 (Programme Vs Achievement)
Annexure 5C Hydro capacity
addition programme for the year 2005- 06
Annexure 5D Hydro Electric
Schemes accorded commercial viability by CEA during 2004-05
Annexure 5E Hydro Electric
Schemes for Which Estimates for Stage-II activities
cleared by CEA during 2004-05
Annexure 6A Thermal capacity
addition programmed / commissioned during 2004-05
Annexure 6B Commissioning programme
of Thermal Generating units during 2005-06
Annexure 7A Details of Hydro Schemes cleared Techno-Economically by CEA
during 2004-05
Annexure 7B Total reduction in
Soft Cost for the schemes cleared by CEA during 2004-05 (All Regions)
Annexure 7C Hydro Electric
Schemes for which TEC has been transferred by CEA during 2004-05
Annexure 8A Hydro Power Stations in operation for which Consultancy Services have been rendered by CEA
Annexure 8B List
of Projects for which detailed Design & Engineering Services were provided during 2004-05
Annexure 10A Detail of the Officers of CEA deputed abroad for Training /
Study Tours etc.
Annexure 11A All India /
Sector-wise / Organization-wise Thermal Generation Target / Actual for 2004-05