- Thermal
- Hydro
- Power System
- The project schemes pertaining to transmission and transformation works at 220 kV and above are monitored by the Power System Project Monitoring (PSPM) Division of the Central Electricity Authority. Transmission works of 132 kV are also monitored in certain cases as also for the States of North-Eastern Region.
- All the transmission schemes of the Power Utilities have been divided in the two categories:
- The schemes which are connected basically with evacuation of Power from generating stations and
- The schemes that are connected with the strengthening of power system network. Utility-wise progress of transmission works for evacuation of power from stations are furnished in "D".
- Transmission Capacity Addition during 9th Plan (1997-2002) and Programme of Construction
Monthly Progress Report of Construction of Transmission Works
- Executive Summary Of Transmission Works
- Statement Showing Transmission Lines Completed During the Year Till Date
- Statement Showing The Sub Station Completed During The Year Till Date
- Report Indicating Status of Construction of Transmission Lines (220 KV & Above) Vis-a-Vis Programme during 2010-11
- Report Indicating Status of Construction of Sub-stations (220 KV & Above) Vis-a-Vis Programme during 2010-11
- Status Of Transmission Schemes For Evacuation Of Power From Generating Stations Scheduled For the year 10-11 and Year 11-12
- Transmission Capacity Addition Programme During 2005-06
- Transmission Capacity Addition Programme During 2006-07
- Transmission Capacity Addition Programme During 2007-08
- Transmission Capacity Addition Programme During 2008-09
- Transmission Capacity Addition Programme During 2009-10
- Transmission Capacity Addition During X Plan and Programme of Construction For XI Plan