CONTENTS

 

S.No

Item

Page

1

Highlights of power sector

1-2

1.1

Capacity addition & generation during the month

3

2

Capacity addition- programme /feasible during 11th Plan

4

3

Capacity addition-programme/achievement during the current year

5

4

Energy generation-programme/achievement during the current year

6

5

All India plant load factor- sector wise during the current year

7

6

All India generating installed capacity- region wise

8

7

All India installed capacity of power utilities – sector & mode wise

9-10

8

Growth of installed capacity since 6th plan

11

9

Coal supply position

12

10

Transmission lines and sub station- programme /achievement during the current year

13

11

Transmission and substations  works commissioned during the month

14

12

Status of transmission sector as on end of the month

15

13

Rural electrification & pump sets energized and Status of schemes cleared

16

14

Generation capacity addition-sector/plant wise for the current year

17-20

15

Power cuts on industries during the month

21

16

Power supply to agriculture sector during the month

22

17

Power supply position and peak demand/ peak met (provisional) during the month

23-24

18

Power supply position and peak demand/peak met (actual)-Previous Month

25-26

19

All India installed capacity -region wise/ sector wise /mode wise

27-33

20

 

Rate of sale of  power of generating stations in the country for the year 2008-09

 

34-42