CONTENTS
S.No
Item
Page
1
Highlights of power sector
1-2
1.1
Capacity addition & generation during the month
3
2
Capacity addition- programme /feasible during 11th Plan
4
Capacity addition-programme/achievement during the current year
5
Energy generation-programme/achievement during the current year
6
All India plant load factor- sector wise during the current year
7
All India generating installed capacity- region wise
8
All India installed capacity of power utilities – sector & mode wise
9-10
Growth of installed capacity since 6th plan
11
9
Coal supply position
12
10
Transmission lines and sub station- programme /achievement during the current year
13
Transmission and substations works commissioned during the month
14
Status of transmission sector as on end of the month
15
Rural electrification & pump sets energized and Status of schemes cleared
16
Generation capacity addition-sector/plant wise for the current year
17-20
Power cuts on industries during the month
21
Power supply to agriculture sector during the month
22
17
Power supply position and peak demand/ peak met (provisional) during the month
23-24
18
Power supply position and peak demand/peak met (actual)-Previous Month
25-26
19
All India installed capacity -region wise/ sector wise /mode wise
27-33
20
Rate of sale of power of generating stations in the country for the year 2008-09
34-42