Central Electricity Authority (CEA) is a Statutory Body constituted under the erstwhile Electricity (Supply) Act, 1948, hereinafter replaced by the Electricity Act 2003, where similar provisions exists, the office of the CEA is an "Attached Office" of the Ministry of Power. The CEA is responsible for the technical coordination and supervision of programmes and is also entrusted with a number of statutory functions. More ....

New Uploads

  1. Establishment of National Power CommitteeUploaded on 28/03/2013
  2. Draft Report of EPS of Mega Cities Uploaded on 18/03/2013
  3. Proforma for forwarding details regarding preparedness of the Captive Power Plants in respect of application for long term Coal LinkageUploaded on 14/03/2013
  4. Brief progress report for Sasan, Mundra, Krishnapatnam and Tilaiya UMPPs Uploaded on 14/03/2013
  5. Expression of Interest for Engagement of Consultant for Preparation of Detailed Project Report for R&M of coal fired Thermal Power PlantsUploaded on 20/02/2013
  6. List of transmission Lines and Sub-station commissioned during Jan 2013Uploaded on 08/02/2013
  7. CDM - CO2 Baseline DatabaseUploaded on 31/01/2013
  8. Manual on Transmission Planning Criteria- January 2013Uploaded on 31/01/2013
  9. Minutes of the meeting held on 18th Jan., 2013 regarding 18th Electric Power Survey of Mega Cities (Electric Power Survey of India Vol.II)Uploaded on 31/01/2013
  10. Record Notes of the Meeting held on 24.01.2013 to review the RFD targets in respect of commissioning of transmission lines for the year 2012-13.Uploaded on 31/01/2013
  11. Meeting to review the RFD targets in respect of commissioning of transmission lines for the year 2012-13.Uploaded on 17/01/2013
  12. 96th Central PTCC MeetingUploaded on 14/01/2013
  13. Preparation of Crisis & Disaster Management Plan (C&DMP)- Ministry of PowerUploaded on 07/01/2013
  14. Preparation of Crisis Management Plan in respect of State Power UtilitiesUploaded on 07/01/2013
  15. Report on 18th EPS of Mega Cities of Indiaअपलोड किया गया:07/01/2013
  16. Inputs Regarding Ensuring 24x7 Power Supply to Rural Domestic Consumers and Also Meeting the Agricultural Load Requirement at national level by way of Feeder Segregation Scheme or Other Alternatives.Uploaded on 11/12/2012
  17. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 23rd november 2012Uploaded on 23/11/2012
  18. Public Notice Relating to Review of transmission Planning CriteriaUploaded on 20/11/2012
  19. Engagement of Consultants in CEAUploaded on 09/11/2012
  20. Corrigendum and subsequently Revised Comprehensive Award Scheme(s) for the Distribution Companies and Rural Distribution Franchisees (RDFs) for the year 2011-1231/10/2012
  21. Highlights for Review of performance of thermal power StationsUploaded on 23/10/2012
  22. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 30th October 2012Uploaded on 22/10/2012
  23. Promotion of officers to the grade of Dy. Director/Executive Engineers of CPES in Central Electricity Authority - recommendations of Review DPC reg.Uploaded on 17/10/2012
  24. Comprehensive Award Scheme(s) for the Distribution Companies and Rural Distribution Franchisees (RDFs) for the year 2011-12Uploaded on 05/10/2012
  25. Load Generation Balance Report 2012-13Uploaded on 28/09/2012
  26. Submission of Generation target for 2013-14 by all Thermal/Nuclear generating Companies by 26.10.2012.Uploaded on 26/09/2012
  27. Central Power Book Writing award Plan -2012.Uploaded on 21/09/2012
  28. Revised Formats for Furnishing the Application for getting certificate by Chief Engineer, CEA for the Goods required for setting up of Ultra Mega Power Projects.Uploaded on 21/09/2012
  29. Power Glossary for promotion of use of Rajbhasha (Standard Terminology) in Official Works terms widely used in Power Sector ParlanceUploaded on 07/09/2012
  30. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 14th September 2012Uploaded on 05/09/2012
  31. Outcome of Technical Evaluation of Bidders in regard to Scheme for ‘Computerization of PTCC ProcessUploaded on 05/09/2012
  32. Report of the Enquiry Committee on Grid Disturbance Uploaded on 30/08/2012
  33. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 29th August 2012Uploaded on 22/08/2012
  34. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 23rd July 2012 Uploaded on 17/07/2012
  35. National Perspective Plan for R&D in Indian Power SectorUploaded on 06/07/2012
  36. Annual Generation Target 2012-13 (930 billion units as conveyed by MoP letter No. 5/1/2012-OM/340 dated 1/6/2012) Uploaded on 03/07/2012
  37. Agenda of 95th Central PTCC meeting to be held on 6th July, 2012 at JabalpurUploaded on 02/07/2012
  38. Outcome of Pre-Qualification of Bidders in regard to RFP for "Computerization of PTCC Process Uploaded on 28/06/2012
  39. Meeting of Agenda Note for “Associated Transmission System” for evacuation of power from generating stations to be held on 25th June 2012 Uploaded on 20/06/2012
  40. Draft National Electricity Plan Uploaded on 06/06/2012
  41. Report on minimisation of water requirement in coal based thermal power stations Uploaded on 08/05/2012
  42. RFP for Computerization of PTCC Process - 1.Additional Clarifications
    2.Additional CorrigendumUploaded on 30/04/2012
  43. Report of the Group for Studying Range of Blending of Imported Coal with Domestic CoalUploaded on 30/04/2012
  44. "Engagement of Consultants in CEA"Uploaded on 30/04/2012
  45. RFP for Computerization of PTCC Process- Bid Submission Date extended to 11.5.2012Uploaded on 25/04/2012
  46. "Report on Fly Ash Generation at Coal/Lignite Based Thermal Power Stations and its Utilization in the Country for 1st Half of the Year 2011-12."Uploaded on 25/04/2012
  47. "Best Practices of Discoms"Uploaded on 18/04/2012
  48. "Agenda for the 1st Meeting of the Committee to review the Methodology of preparing the Power Supply Position."Uploaded on 11/04/2012
  49. "Report on Fly Ash Generation at Coal/Lignite Based Thermal Power Stations and its Utilization in the Country for the year 2010-11."Uploaded on 03/04/2012
  50. "Annual Generation Target 2012-13Uploaded on 30/03/2012
  51. "Draft National Electricity Plan for 12thPlan - Suggestions/Objections may be sent to CEA by 31st May,2012"Uploaded on 29/03/2012
  52. "Replies to Queries and Corrigendum to RFP for "Computerization of PTCC process"; Bid Submission date extended to 27thApril 2012"Uploaded on 27/03/2012
  53. "Gas Availability for new Gas Based Power Plants"Uploaded on 22/03/2012
  54. "Request for Proposal for System Integrator under the Scheme of Computerisation of PTCC Process"Uploaded on 20/03/2012
  55. "Minutes of 94th Central PTCC Meeting held on 20-01-2012"Uploaded on 12/03/2012
  56. "Comments are invited from public/stakeholders on Cost effective single phase Smart Meters – functional requirement specifications within one month of publication of the advertisement in the newspapers."Uploaded on 07/03/2012
  57. "Replies to Queries and Corrigendum"Uploaded on 06/03/2012
  58. Meeting Notice and Agenda Note of All India Joint Standing Committee MeetingUploaded on 16/02/2012
  59. "National Conference on Demand Side Management"Uploaded on 13/02/2012
  60. Presentation of Indian_Japan interactive Workshop on Clean Coal Technology with focus on Coal Gasification held on 8/2/2012 at New DelhiUploaded on 09/02/2012
  61. Furnishing of Updated informations from Developers of Captive Power Plants for Coal LinkageUploaded on 07/02/2012
  62. CDM - CO2 Baseline DatabaseUploaded on 27/01/2012
  63. Brief Progress Report for Sasan,Mundra and Krishnapatnam UMPPsUploaded on 24/01/2012
  64. Furnishing of Details regarding Pre Qualification and prioritization of the 12th Plan TPP for Coal Linkage"-Last date for submission of information has been extended to 15th February 2012Uploaded on 19/01/2012
  65. Minutes of the meeting held on 4th Jan,2012 regarding 18th Electric Power Survey of Mega Cities ( Electric Power Survey of India Vol.II)Uploaded on 17/01/2012
  66. Comments are invited from public/stakeholders on Cost effective single phase Smart Meters – functional requirement specifications by 20-01-2012Uploaded on 04/01/2012
  67. Agenda for the 94th Central PTCC MeetingUploaded on 03/01/2012
  68. Format For Furnishing the Application for getting the Certificate from Chief Engineer, CEA, NEW DELHI Certifying the Quantity, Description and Specification of the Goods Required for the Power projectUploaded on 21/10/2011
  69. One Day Workshop on PoC Charges RegimeUploaded on 22/09/2011
  70. Electric Power Survey of Mega Cities (Vol.III) of 18th EPS Report-regd.Uploaded on 04/08/2011
  71. Performance Award Scheme for Distribution Companies (Consideration Year 2010-11)Uploaded on 29/07/2011
  72. Performance Award Scheme for Rural Distribution Franchisees (Consideration Year 2010-11)Uploaded on 29/07/2011
  73. Postponement of one day workshop on "Disaster Management in Power Sector" organised by NIDM & CEAUploaded on 21/07/2011
  74. Minutes of third meeting of 18th Electric Power Survey CommitteeUploaded on 12/07/2011
  75. Revised LGBR Report 2011-12Uploaded on 05/07/2011
  76. Inviting Comments on the report "Guidelines for Load Acceptance Criteria for Hydro Electric Power Plants"Uploaded on 28/06/2011
  77. Venue and Agenda Note of third meeting of 18th Electric Power Survey CommitteeUploaded on 21/06/2011
  78. Notice of third meeting of 18th Electric Power Survey CommitteeUploaded on 13/06/2011
  79. Revised Annual Returns for the Year 2010-2011 regarding Implementation of RTI Act, 2005Uploaded on 08/06/2011
  80. Minutes of 93rd Central PTCC MeetingUploaded on 07/06/2011
  81. Result Framework Document (RFD) Target 2011-12 (Ministry of Power)Uploaded on 16/05/2011
    1. Transmission Lines
    2. Transformation capacity
  82. Central Electricity Authority (Safety requirements for construction, operation and maintenance of electrical plants and electric lines) Regulations 2011Uploaded on 05/05/2011
  83. Operation Performance of Generating Stations in the country during the year 2010-11Uploaded on 21/04/2011
  84. Advisory issued by CEA for Design of new boilers for Blend Ratio of 30:70 (or higher) imported/high GCV coal: indigenous coalUploaded on 19/04/2011
  85. Requirement of the services of consultant for Electricity Demand Forecast under 18th Electric Power Survey CommitteeUploaded on 18/04/2011
  86. Minutes of Second Meeting of 18th Electric Power Survey CommitteeUploaded on 15/04/2011
  87. Format for Collection of Data from Utilities for the study on "Performance of Equipment Sourced from Foriegn manufacturers"Uploaded on 13/04/2011
  88. Agenda & Programme for 93rd PTCC MeetingUploaded on 11/04/2011
  89. Brief Progress Report for Sasan, Mundra and Krishnapatnam UMPPsUploaded on 07/04/2011
  90. Venue and Agenda Note of Second Meeting of 18th Electric Power Survey CommitteeUploaded on 22/03/2011
  91. Amendment of coal linkage policy for 12th Plan Power ProjectsUploaded on 22/03/2011
  92. Notice of second meeting of 18th Electric Power Survey CommitteeUploaded on 03/03/2011
  93. Allocation of Natural Gas for 12th PlanUploaded on 01/03/2011
  94. Record of discussions of the meeting held on 17th Feb.,2011 to review the availability of input data in respect of North Eastern Region states/utilities for 18th Electric Power Survey of the countryUploaded on 24/02/2011
  95. Record of discussions of the meeting held on 4th Feb.,2011 to review the availability of input data in respect of Southern Region states/utilities for 18th Electric Power Survey of the countryUploaded on 11/02/2011
  96. Clarification in "Request for Proposal for engagement of consultant for implementation of computerisation of PTCC Process" after pre-bid conference held on 28-01-2011 at NRPC, New DelhiUploaded on 01/02/2011
  97. Revised-Request for Proposal for engagement of consultant for implementation of computerisation of PTCC ProcessUploaded on 01/02/2011
  98. Projects Commissioned / being monitored for benefits during 11th PlanUploaded on 10/01/2011
  99. Format for Allocation of Gas for 12th Plan ProjectsUploaded on 07/01/2011
  100. Record of discussions of the meeting taken by Member (Planning) CEA on 6th December, 2010 to review input data availability For 18th Electric Power Survey (EPS) of IndiaUploaded on 14/12/2010
  101. PTCC Manual 2010Uploaded on 13/12/2010
  102. Requirement of input data in the prescribed formats for 18th Electric Power Survey (EPS)Uploaded on 25/11/2010
  103. Proformae for data collection of 18th Electric Power SurveyUploaded on 21/10/2010
  104. Guidelines for Qualifying Requirements for Bidders of Balance of Plant for Coal/ Lignite based Thermal Power StationsUploaded on 13/10/2010
  105. CEA (Technical Standards for Construction of Electrical Plants and Electric Lines)Regulations,2010Uploaded on 08/10/2010
  106. Certificate by Chief Engineer, CEA for the goods supplied to mega power project in accordance with the Ministry of Finance Notification No. 31/2010 Central Excise dated 28th July, 2010Uploaded on 01/10/2010
  107. Follow up action on the decisions taken during the Ist meeting of 18th Electric Power Survey Committee (EPSC) on 27.08.2010 Uploaded on 30/09/2010
  108. Record of Discussions of the brain storming session and Ist meeting of 18th Electric Power Survey Committee (EPSC) held at CBIP, Conference Hall on 27th August, 2010 Uploaded on 30/09/2010
  109. Standard Design Criteria/ Guidelines for Balance Of Plant of 2x(500 MW or above) Thermal Power Project Uploaded on 28/09/2010
  110. Review of land requirement for Thermal Power Stations Uploaded on 28/09/2010
  111. Extension of the last date for EoI and MQR for appointment of consultant for computerization scheme of PTCC process Uploaded on 20/09/2010
  112. CEA (GRID STANDARDS) Regulations,2010 Uploaded on 03/09/2010
  113. CEA (Installation and Operation of Meters) Amendment Regulations,2010 Uploaded on 03/09/2010
  114. Agenda paper for Ist meeting of 18th EPS Committee Uploaded on 13/08/2010
  115. Regional Level Meeting of North Eastern region Uploaded on 13/08/2010
  116. Mainstreaming of Disaster Management into the developmental process by the Central Ministries Uploaded on 12/08/2010
  117. Revised Regional Level Meeting of Eastern region Uploaded on 11/08/2010
  118. Regional Level Meeting of Southern region Uploaded on 11/08/2010
  119. Regional Level Meeting of Eastern region Uploaded on 11/08/2010
  120. Proforma of regulations for Kendriya Vidhut Pustak Lekhan Puraskar Yojana 2010 Uploaded on 14/07/2010
  121. Summary Report of Mapping of 85 pulverized coal fired thermal power generating units in different states (Under Indo-German Energy Program (IGEN)) Uploaded on 13/07/2010
  122. Comments on UI Regulations Uploaded on 21/04/2010
  123. Report of Combined Committee headed by Member(GO&D),CEA on the issue of Trg. and certification of system operators Uploaded on 09/04/2010
  124. Constitution of Committees on 18th EPS & Review/updation of document Crisis Disaster Management Plan for Power Sector Uploaded on 07/04/2010
  125. Comments on Frequent Congestion in the inter-State transmission system affecting operation of the Power Exchanges Uploaded on 19/03/2010
  126. Comments on draft Indian Electricity Grid Code proposed to be enforced from 1.4.2010 Uploaded on 12/03/2010
  127. CEA's Comments on CERC Proposal on Transmission Pricing Uploaded on 02/03/2010
  128. Guidelines for Energy Auditing of Pulverised coal/lignite fired Thermal Power Stations Uploaded on 18/02/2010
  129. Guidelines for Spec. of Energy Efficient Outdoor Type Single & Three Phase Distribution Transformers Uploaded on 08/02/2010
  130. Presentations - Phasing Out of Carbon Tetra Chloride from Indian Power Sector Uploaded on 08/02/2010
  131. Draft for Comments - Standard Design Criteria/Guidelines for Balance of Plant of 2x(500MW or above) Thermal Power Project Uploaded on 03/02/2010
  132. Report of Task Force on Integration of Solar Systems Uploaded on 03/02/2010
  133. Sourcing of Supercritical units from indigenous manufacturers Uploaded on 29/01/2010
  134. Report of Sub Group II & III on Integration of Solar Systems with Thermal /Hydro power Stations Uploaded on 21/01/2010
  135. Recruitment of Regulatory Experts in MERC Uploaded on 21/01/2010
  136. Minutes of 90th Central PTCC Meeting Uploaded on 20/01/2010
  137. Draft for Comments - Technology Development Prospects for the Indian Power Sector Uploaded on 11/01/2010
  138. National Perspective Plan for R&M and Life Extension of Thermal Power Stations (Up To 2016-2017) Uploaded on 11/01/2010
  139. Detailed project Report for Grid Interactive Roof Top Solar Photovoltaic Power Plant at Sewa Bhawan Uploaded on 22/12/2009
  140. Report of Subgroup-I on Grid Interactive Roof Top Solar PV System Uploaded on 21/12/2009
  141. Technical Specification of Grid Interactive Roof Top solar PV System for Sewa Bhawan Uploaded on 21/12/2009
  142. Highlights of 17th Electric Power Survey of India Uploaded on 18/12/2009
  143. Inviting Applications / Nominations for Selection of the post of member of the Punjab state Electricity Regulatory Commission Uploaded on 26/11/2009
  144. Review Of Tendering Procedures And Documents Followed By Public Utilities For Renovation & Modernisation Projects Uploaded on 11/11/2009
  145. Inviting Applications / Nominations for Selection of the post of Chairperson of the Karnataka Electricity Regulatory Commission Uploaded on 09/11/2009
  146. Report on Carbon Tetrachloride phase out from Power Sector given by committee constituted by Chairperson,CEA Uploaded on 15/10/2009
  147. Presentations-International Conclave on Key inputs for Accelerated Development of Indian Power Sector for 12th Plan and Beyond - 18th - 19th Aug,2009, New Delhi Uploaded on 14/10/2009
  148. Environment Management Award Scheme for Coal based Thermal Power Stations 2009-10 Uploaded on 25/09/2009
  149. Draft of Conclave on Model Contract Documents for Development of Hydro Projects Uploaded on 17/09/2009
  150. Revised definition of Commissioning of Generation Power Projects Uploaded on 15/09/2009
  151. Recommendations of International Conclave Uploaded on 10/09/2009
  152. Data format for Gas based Captive Power PlantUploaded on 12/08/2009
  153. Efficiency of Super Critical Units to be installed in the country Uploaded on 30/07/2009
  154. Basic Paper for International Conclave Uploaded on 24/07/2009
  155. Information Bulletin for International Conclave by CEA Uploaded on 15/07/2009
  156. Book Writing Competition-in Hindi Uploaded on 08/07/2009
  157. Sample RFP for Urban Distribution Franchisee Uploaded on 03/07/2009
  158. Revised Draft Regulations [(Safety requirements for construction, operation and maintenance of electrical plants and electric lines-2008) & (Construction of Electrical Plants and Electric Lines-2009)] Uploaded on 17/06/2009
    1. Draft Regulations under the Electricity Act 2003
      1. The following regulations have been finalised after considering the comments received on the pre-published draft regulations and have been sent to Ministry of Power for approval. These regulations may be considered as guidelines till the time final regulations are notified after approval by Ministry of Power

        1. Central Electricity Authority (Safety requirements for construction, operation and maintenance of electrical plants and electric lines) Regulations 2008
  159. Report of the Committee to study design features of Chinese BoilersUploaded on 05/06/2009
    1. Report of Committee to study Design Features of Boilers and Auxiliaries being sourced from Chinese Manufacturerspdf icon
    2. Letter from Durgapur Project Limitedpdf icon
  160. Balance of Plant order status Uploaded on 05/06/2009
  161. AT&C Losses (As per PFC Data) Uploaded on 29/04/2009
  162. Report of Project Implementation Committee on Energy Meter Communication Protocol Uploaded on 28/04/2009
  163. Report of High Level Committee on Energy Meter Communication Protocol Uploaded on 28/04/2009
  164. Guideline for Energy Auditing of Thermal Power Station (Draft) Uploaded on 11/02/2009
  165. Comprehensive Award Scheme for Power Sector (2007-08)-Oct'08 Uploaded on 08/12/2008
  166. Insulation Requirement of EHV Transmission lines of Various Voltages Uploaded on 02/12/2008
  167. Standard Technical Specification For Main Plant Package Of Sub- Critical Thermal Power Project 2x(500 MW or above) Uploaded on 17/10/2008
  168. Exemption in Excise Duty for Ultra Mega Power Projects (UMPPs) Uploaded on 08/10/2008
  169. CO2 Baseline Emission factor for units with Super Critical Steam Parameters Uploaded on 06/10/2008