Central Electricity Authority (CEA) is a Statutory Body constituted under the erstwhile Electricity (Supply) Act, 1948, hereinafter replaced by the Electricity Act 2003, where similar provisions exists, the office of the CEA is an "Attached Office" of the Ministry of Power. The CEA is responsible for the technical coordination and supervision of programmes and is also entrusted with a number of statutory functions. More ....

New Uploads

  1. CDM - CO2 Baseline DatabaseUploaded on 27/01/2012
  2. Brief Progress Report for Sasan,Mundra and Krishnapatnam UMPPsUploaded on 24/01/2012
  3. Furnishing of Details regarding Pre Qualification and prioritization of the 12th Plan TPP for Coal Linkage"-Last date for submission of information has been extended to 15th February 2012Uploaded on 19/01/2012
  4. Minutes of the meeting held on 4th Jan,2012 regarding 18th Electric Power Survey of Mega Cities ( Electric Power Survey of India Vol.II)Uploaded on 17/01/2012
  5. Comments are invited from public/stakeholders on Cost effective single phase Smart Meters – functional requirement specifications by 20-01-2012Uploaded on 04/01/2012
  6. Agenda for the 94th Central PTCC MeetingUploaded on 03/01/2012
  7. Format For Furnishing the Application for getting the Certificate from Chief Engineer, CEA, NEW DELHI Certifying the Quantity, Description and Specification of the Goods Required for the Power projectUploaded on 21/10/2011
  8. One Day Workshop on PoC Charges RegimeUploaded on 22/09/2011
  9. Electric Power Survey of Mega Cities (Vol.III) of 18th EPS Report-regd.Uploaded on 04/08/2011
  10. Performance Award Scheme for Distribution Companies (Consideration Year 2010-11)Uploaded on 29/07/2011
  11. Performance Award Scheme for Rural Distribution Franchisees (Consideration Year 2010-11)Uploaded on 29/07/2011
  12. Postponement of one day workshop on "Disaster Management in Power Sector" organised by NIDM & CEAUploaded on 21/07/2011
  13. Minutes of third meeting of 18th Electric Power Survey CommitteeUploaded on 12/07/2011
  14. Revised LGBR Report 2011-12Uploaded on 05/07/2011
  15. Inviting Comments on the report "Guidelines for Load Acceptance Criteria for Hydro Electric Power Plants"Uploaded on 28/06/2011
  16. Venue and Agenda Note of third meeting of 18th Electric Power Survey CommitteeUploaded on 21/06/2011
  17. Notice of third meeting of 18th Electric Power Survey CommitteeUploaded on 13/06/2011
  18. Revised Annual Returns for the Year 2010-2011 regarding Implementation of RTI Act, 2005Uploaded on 08/06/2011
  19. Minutes of 93rd Central PTCC MeetingUploaded on 07/06/2011
  20. Result Framework Document (RFD) Target 2011-12 (Ministry of Power)Uploaded on 16/05/2011
    1. Transmission Lines
    2. Transformation capacity
  21. Central Electricity Authority (Safety requirements for construction, operation and maintenance of electrical plants and electric lines) Regulations 2011Uploaded on 05/05/2011
  22. Operation Performance of Generating Stations in the country during the year 2010-11Uploaded on 21/04/2011
  23. Advisory issued by CEA for Design of new boilers for Blend Ratio of 30:70 (or higher) imported/high GCV coal: indigenous coalUploaded on 19/04/2011
  24. Requirement of the services of consultant for Electricity Demand Forecast under 18th Electric Power Survey CommitteeUploaded on 18/04/2011
  25. Minutes of Second Meeting of 18th Electric Power Survey CommitteeUploaded on 15/04/2011
  26. Format for Collection of Data from Utilities for the study on "Performance of Equipment Sourced from Foriegn manufacturers"Uploaded on 13/04/2011
  27. Agenda & Programme for 93rd PTCC MeetingUploaded on 11/04/2011
  28. Brief Progress Report for Sasan, Mundra and Krishnapatnam UMPPsUploaded on 07/04/2011
  29. Venue and Agenda Note of Second Meeting of 18th Electric Power Survey CommitteeUploaded on 22/03/2011
  30. Amendment of coal linkage policy for 12th Plan Power ProjectsUploaded on 22/03/2011
  31. Notice of second meeting of 18th Electric Power Survey CommitteeUploaded on 03/03/2011
  32. Allocation of Natural Gas for 12th PlanUploaded on 01/03/2011
  33. Record of discussions of the meeting held on 17th Feb.,2011 to review the availability of input data in respect of North Eastern Region states/utilities for 18th Electric Power Survey of the countryUploaded on 24/02/2011
  34. Record of discussions of the meeting held on 4th Feb.,2011 to review the availability of input data in respect of Southern Region states/utilities for 18th Electric Power Survey of the countryUploaded on 11/02/2011
  35. Clarification in "Request for Proposal for engagement of consultant for implementation of computerisation of PTCC Process" after pre-bid conference held on 28-01-2011 at NRPC, New DelhiUploaded on 01/02/2011
  36. Revised-Request for Proposal for engagement of consultant for implementation of computerisation of PTCC ProcessUploaded on 01/02/2011
  37. Projects Commissioned / being monitored for benefits during 11th PlanUploaded on 10/01/2011
  38. Format for Allocation of Gas for 12th Plan ProjectsUploaded on 07/01/2011
  39. Record of discussions of the meeting taken by Member (Planning) CEA on 6th December, 2010 to review input data availability For 18th Electric Power Survey (EPS) of IndiaUploaded on 14/12/2010
  40. PTCC Manual 2010Uploaded on 13/12/2010
  41. Requirement of input data in the prescribed formats for 18th Electric Power Survey (EPS)Uploaded on 25/11/2010
  42. Proformae for data collection of 18th Electric Power SurveyUploaded on 21/10/2010
  43. Guidelines for Qualifying Requirements for Bidders of Balance of Plant for Coal/ Lignite based Thermal Power StationsUploaded on 13/10/2010
  44. CEA (Technical Standards for Construction of Electrical Plants and Electric Lines)Regulations,2010Uploaded on 08/10/2010
  45. Certificate by Chief Engineer, CEA for the goods supplied to mega power project in accordance with the Ministry of Finance Notification No. 31/2010 Central Excise dated 28th July, 2010Uploaded on 01/10/2010
  46. Follow up action on the decisions taken during the Ist meeting of 18th Electric Power Survey Committee (EPSC) on 27.08.2010 Uploaded on 30/09/2010
  47. Record of Discussions of the brain storming session and Ist meeting of 18th Electric Power Survey Committee (EPSC) held at CBIP, Conference Hall on 27th August, 2010 Uploaded on 30/09/2010
  48. Standard Design Criteria/ Guidelines for Balance Of Plant of 2x(500 MW or above) Thermal Power Project Uploaded on 28/09/2010
  49. Review of land requirement for Thermal Power Stations Uploaded on 28/09/2010
  50. Extension of the last date for EoI and MQR for appointment of consultant for computerization scheme of PTCC process Uploaded on 20/09/2010
  51. CEA (GRID STANDARDS) Regulations,2010 Uploaded on 03/09/2010
  52. CEA (Installation and Operation of Meters) Amendment Regulations,2010 Uploaded on 03/09/2010
  53. Agenda paper for Ist meeting of 18th EPS Committee Uploaded on 13/08/2010
  54. Regional Level Meeting of North Eastern region Uploaded on 13/08/2010
  55. Mainstreaming of Disaster Management into the developmental process by the Central Ministries Uploaded on 12/08/2010
  56. Revised Regional Level Meeting of Eastern region Uploaded on 11/08/2010
  57. Regional Level Meeting of Southern region Uploaded on 11/08/2010
  58. Regional Level Meeting of Eastern region Uploaded on 11/08/2010
  59. Proforma of regulations for Kendriya Vidhut Pustak Lekhan Puraskar Yojana 2010 Uploaded on 14/07/2010
  60. Summary Report of Mapping of 85 pulverized coal fired thermal power generating units in different states (Under Indo-German Energy Program (IGEN)) Uploaded on 13/07/2010
  61. Comments on UI Regulations Uploaded on 21/04/2010
  62. Report of Combined Committee headed by Member(GO&D),CEA on the issue of Trg. and certification of system operators Uploaded on 09/04/2010
  63. Constitution of Committees on 18th EPS & Review/updation of document Crisis Disaster Management Plan for Power Sector Uploaded on 07/04/2010
  64. Comments on Frequent Congestion in the inter-State transmission system affecting operation of the Power Exchanges Uploaded on 19/03/2010
  65. Comments on draft Indian Electricity Grid Code proposed to be enforced from 1.4.2010 Uploaded on 12/03/2010
  66. CEA's Comments on CERC Proposal on Transmission Pricing Uploaded on 02/03/2010
  67. Guidelines for Energy Auditing of Pulverised coal/lignite fired Thermal Power Stations Uploaded on 18/02/2010
  68. Guidelines for Spec. of Energy Efficient Outdoor Type Single & Three Phase Distribution Transformers Uploaded on 08/02/2010
  69. Presentations - Phasing Out of Carbon Tetra Chloride from Indian Power Sector Uploaded on 08/02/2010
  70. Draft for Comments - Standard Design Criteria/Guidelines for Balance of Plant of 2x(500MW or above) Thermal Power Project Uploaded on 03/02/2010
  71. Report of Task Force on Integration of Solar Systems Uploaded on 03/02/2010
  72. Sourcing of Supercritical units from indigenous manufacturers Uploaded on 29/01/2010
  73. Report of Sub Group II & III on Integration of Solar Systems with Thermal /Hydro power Stations Uploaded on 21/01/2010
  74. Recruitment of Regulatory Experts in MERC Uploaded on 21/01/2010
  75. Minutes of 90th Central PTCC Meeting Uploaded on 20/01/2010
  76. Draft for Comments - Technology Development Prospects for the Indian Power Sector Uploaded on 11/01/2010
  77. National Perspective Plan for R&M and Life Extension of Thermal Power Stations (Up To 2016-2017) Uploaded on 11/01/2010
  78. Detailed project Report for Grid Interactive Roof Top Solar Photovoltaic Power Plant at Sewa Bhawan Uploaded on 22/12/2009
  79. Report of Subgroup-I on Grid Interactive Roof Top Solar PV System Uploaded on 21/12/2009
  80. Technical Specification of Grid Interactive Roof Top solar PV System for Sewa Bhawan Uploaded on 21/12/2009
  81. Highlights of 17th Electric Power Survey of India Uploaded on 18/12/2009
  82. Inviting Applications / Nominations for Selection of the post of member of the Punjab state Electricity Regulatory Commission Uploaded on 26/11/2009
  83. Review Of Tendering Procedures And Documents Followed By Public Utilities For Renovation & Modernisation Projects Uploaded on 11/11/2009
  84. Inviting Applications / Nominations for Selection of the post of Chairperson of the Karnataka Electricity Regulatory Commission Uploaded on 09/11/2009
  85. Report on Carbon Tetrachloride phase out from Power Sector given by committee constituted by Chairperson,CEA Uploaded on 15/10/2009
  86. Presentations-International Conclave on Key inputs for Accelerated Development of Indian Power Sector for 12th Plan and Beyond - 18th - 19th Aug,2009, New Delhi Uploaded on 14/10/2009
  87. Environment Management Award Scheme for Coal based Thermal Power Stations 2009-10 Uploaded on 25/09/2009
  88. Draft of Conclave on Model Contract Documents for Development of Hydro Projects Uploaded on 17/09/2009
  89. Revised definition of Commissioning of Generation Power Projects Uploaded on 15/09/2009
  90. Recommendations of International Conclave Uploaded on 10/09/2009
  91. Data format for Gas based Captive Power PlantUploaded on 12/08/2009
  92. Efficiency of Super Critical Units to be installed in the country Uploaded on 30/07/2009
  93. Basic Paper for International Conclave Uploaded on 24/07/2009
  94. Information Bulletin for International Conclave by CEA Uploaded on 15/07/2009
  95. Book Writing Competition-in Hindi Uploaded on 08/07/2009
  96. Sample RFP for Urban Distribution Franchisee Uploaded on 03/07/2009
  97. Revised Draft Regulations [(Safety requirements for construction, operation and maintenance of electrical plants and electric lines-2008) & (Construction of Electrical Plants and Electric Lines-2009)] Uploaded on 17/06/2009
    1. Draft Regulations under the Electricity Act 2003
      1. The following regulations have been finalised after considering the comments received on the pre-published draft regulations and have been sent to Ministry of Power for approval. These regulations may be considered as guidelines till the time final regulations are notified after approval by Ministry of Power

        1. Central Electricity Authority (Safety requirements for construction, operation and maintenance of electrical plants and electric lines) Regulations 2008
  98. Report of the Committee to study design features of Chinese BoilersUploaded on 05/06/2009
    1. Report of Committee to study Design Features of Boilers and Auxiliaries being sourced from Chinese Manufacturerspdf icon
    2. Letter from Durgapur Project Limitedpdf icon
  99. Balance of Plant order status Uploaded on 05/06/2009
  100. AT&C Losses (As per PFC Data) Uploaded on 29/04/2009
  101. Report of Project Implementation Committee on Energy Meter Communication Protocol Uploaded on 28/04/2009
  102. Report of High Level Committee on Energy Meter Communication Protocol Uploaded on 28/04/2009
  103. Guideline for Energy Auditing of Thermal Power Station (Draft) Uploaded on 11/02/2009
  104. Comprehensive Award Scheme for Power Sector (2007-08)-Oct'08 Uploaded on 08/12/2008
  105. Insulation Requirement of EHV Transmission lines of Various Voltages Uploaded on 02/12/2008
  106. Standard Technical Specification For Main Plant Package Of Sub- Critical Thermal Power Project 2x(500 MW or above) Uploaded on 17/10/2008
  107. Exemption in Excise Duty for Ultra Mega Power Projects (UMPPs) Uploaded on 08/10/2008
  108. CO2 Baseline Emission factor for units with Super Critical Steam Parameters Uploaded on 06/10/2008